Position:Home > NEWS > Company news
How to maintain the POY spinning testing machine when there is a failure in operation
[2024-07-24]

How to maintain the POY spinning testing machine when there is a failure in operation


The POY spinning machine fails during operation, and the following steps need to be taken during maintenance:

First, troubleshooting

Check whether the power cable is properly connected and the power supply voltage is stable. For example, if the power plug is loose, it may cause the device to stop running suddenly.

Look at the display of the control system to check for error codes or alarm messages. Different error codes usually correspond to specific fault types, such as high temperature, abnormal pressure, and so on.

Check the operation of mechanical parts, such as the transmission belt is loose, gear is worn. Taking the transmission belt as an example, if it is too loose, it will lead to transmission failure and affect the normal operation of the equipment.

2. Component maintenance

Clean the spinning nozzle regularly to prevent clogging. Clogged nozzle can lead to uneven spinning or even non-spinning.

Check the heating element to ensure it is working properly and temperature control is accurate. For example, heating element damage may cause the temperature to fail to meet the process requirements, affecting the spinning quality.

Maintain cooling system to ensure good cooling effect. If the cooling system fails, it may overheat components and shorten the service life of the equipment.

Third, lubrication and maintenance

Regular lubrication of key moving parts to reduce wear. For example, components such as screw and guide rails require a proper amount of lubricating oil to ensure smooth operation.

Check the seal, if there is aging or damage should be replaced in time to prevent leakage.

Fourth, regular calibration and testing

Regularly calibrate temperature, pressure and other sensors to ensure the accuracy of measurement data. Inaccurate measurement data can lead to misjudgment of equipment status.

The overall performance of the equipment is regularly tested, including spinning speed, silk quality and other parameters.

In short, for the fault maintenance of the POY spinning testing machine, it is necessary to consider multiple aspects comprehensively, find the problem in time and take effective measures to solve it, and do regular maintenance and testing work to ensure the normal operation of the equipment and spinning quality.


Return